Independent ISO/IEC 17020 accredited inspection — manufacturing surveillance, pre-shipment inspection, on-site witness testing and vendor audits across our office network.
Hold-point and witness-point inspection during fabrication at the supplier's site, including welding and coating control.
Final visual, dimensional and packing check before goods leave the factory — last gate before transit.
Witness testing, factory acceptance tests (FAT), site acceptance tests (SAT) and commissioning support.
Capability and quality-system audits of new and existing suppliers — risk-based scoring and corrective-action follow-up.
A selection of the directives, regulations and standards we cover under this service. Full scope shared per project.
Define inspection points, hold and witness points, and acceptance criteria with the project team.
Mobilise the right inspector — qualified for the relevant code — to the site within 24–48 hours.
Execute the inspection plan, capture findings with photos, measurements and dimensional reports.
Independent inspection report with NCRs, photographs and certifications, delivered the same day.
Tell us your target markets and we'll come back within one business day with a clear scope and timeline.