Contact
Services

Testing & laboratory services

ISO/IEC 17025 accredited laboratories supporting explosion-proof, EMC, environmental and material testing — for CE marking, IECEx, GCC and global market access.

12
In-house laboratories
ISO/IEC 17025
Accredited
95%
On-time delivery
What we do

Four core areas under this service line.

/ 01

Explosion-proof testing

Ex d, Ex e, Ex i, Ex t and Ex n testing for hazardous-area equipment under the IEC 60079 series.

/ 02

EMC testing

Radiated and conducted emissions, immunity (ESD, surge, EFT, dips) and harmonics — pre-compliance and full compliance.

/ 03

Environmental testing

Climatic, mechanical, vibration, shock, IP ingress protection and altitude per EN 60068 and IEC 60529.

/ 04

Materials & destructive testing

Chemical analysis, tensile and impact testing, weld procedure qualification and metallographic examination.

Standards

Standards we work with.

A selection of the directives, regulations and standards we cover under this service. Full scope shared per project.

How it works

Four steps from scope to certificate.

  1. Test plan

    Define applicable standards, test severity levels and acceptance criteria with the lab manager.

  2. Sample preparation

    Receive units, pre-condition, document baseline configuration with photos and serial numbers.

  3. Test campaign

    Execute the plan, capture data and witness results — remote witnessing available via secure video.

  4. Test report

    Compliance report issued in a format directly usable for the certification step that follows.

FAQ

Frequently asked.

Are your laboratories accredited?
Yes — all Boem laboratories operate under ISO/IEC 17025 accreditation. The scope of accreditation is shared per project so you can verify standards covered before booking.
Can I witness the testing?
Absolutely. Witness testing is encouraged and we can also arrange remote witnessing via secure video for engineers who can't travel.
What's the turnaround for a typical EMC campaign?
Three to five working days once the unit is at the lab, depending on the standard and the number of test plan items. Pre-compliance scans run in 24–48 hours.

Ready to start?

Tell us your target markets and we'll come back within one business day with a clear scope and timeline.